| 1 | Dismantling & removing of old existing Radial gate s components (Skin Plate, Vertical stiffeners, Horizontal girders, Turn Buckels, Equaliser arrangement including pins, Clamp plates for bottom and side rubber seals, cast steel rollers assembly complete & accessories including cost of all materials, machinery, labour, cutting, tools, tackle & taxes, all lead & lifts, all safety equipment, transportation to stockyard, etc. complete in all respects. (Radial gate size is 12.19X12.80 meter) | 19.000 | Set |
| 2 | Dismantling of existing old chequered plates of hoist bridge platform of Kota barrage, railing and support angles, housing cover of hoist rope drum/gear assembly/main drive unit, including cost of all materials, machinery, labour, cutting, tools, tackles, taxes, all lead & lifts, all safety equipment, transportation to stockyard as per instructions of Engineer in-charge, complete in all respects. | 19.000 | Set |
| 3 | Dismantling of Existing Old Chequerred Plates of Hoist Bridge Plateform/Hand Railing/Housing Cover of Rope Drum Hoist/End Gear Box/Electric Motor Cover etc. of Rana Rana Pratap Sagar Dam including cost of all materials, amchinery, labour, cutting, tools,tackles, taxes, all lead & lifts, all safety equipments, transportation to stock yard as per instructions of Engineer In-charge, Complete in all respect. | 17.000 | Set |
| 4 | Dismantling of Existing Old Chequerred Plates of Hoist Bridge Plateform/Hand Railing/Housing Cover of Rope Drum Hoist/End Gear Box/Electric Motor Cover etc. of Jawahar Sagar Dam including cost of all materials, amchinery, labour, cutting, tools,tackles, taxes, all lead & lifts, all safety equipments, transportation to stock yard as per instructions of Engineer In-charge, Complete in all respect. | 12.000 | Set |
| 5 | Dismantling & removing of old existing Cat walk bridge at U/S side (2 span) consisting of beams, bracings, stiffeners, ties, chequered plate, hand railing etc. with all other accessories including cost of materials, Machinery, labour, cutting, welding, grinding, tool, takle & taxes, all lead & lifts, all safety, transportation etc. Complete in all respect. | 1.000 | Set |