Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3607723 |
|---|---|
| Organisation Name | Kerala State Electricity Board |
| Tender Brief | Corrigendum : Excavation Of Ordinary Hard Rock Laying Pcc Providing And Laying In Position Rcc Fixing Stub Foundation Bolt And Plastering Etc |
| Last Date For Submission | 30th Mar, 2026 |
| Opening Date | 04 Apr, 2026 |
| Document Cost | 5900.00 |
|---|---|
| EMD | 50000.00 |
| Estimated Cost | 1550424.00 |
| City | Kozhikode |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. Ordinary rock | 40.000 | m3 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. Hard rock (blasting prohibited) | 58.750 | m3 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineering-charge. For initial lift of 1.50m Extra for every additional lift or part there of.(Ordinary rock) | 145.700 | m3 |
| 4 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan), lift beyond 1.5 M upto 3 m disposed earth to be levelled and neatly dressed.-Hard rock (blasting prohibited). | 90.000 | m3 |
| 5 | Providing and laying in position Cement concrete of specified grade, excluding the cost of centering,shuttering. All work upto plinth level. 1:3:6 (1cement:3 coarse sand:6 graded stone aggregate 40mm nominal size). | 6.600 | m3 |
11 Days Left