| Tender ID | 3779568 |
|---|---|
| Organisation Name | Public Health Engineering Department |
| Tender Brief | Nit No 67/2025-26 Annual Rate Contract For Providing Household Service Connections( Hscs) Including One Year Defect Liability Period Under The Jurisdiction Of Sub Division Kuchaman City And Nawa |
| Last Date For Submission | 30th Mar, 2026 |
| Opening Date | 30 Mar, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 40000.00 |
| Estimated Cost | 2000000.00 |
| City | Kuchaman |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in trenches of required width and gradient for laying and jointing of pipe line including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 Mtr. including taking out the excavated soil, and then returning the soil as required in layers not exceeding 20cm in depth including consolidating each deposited layer by ramming, watering etc. and disposal of surplus excavated soil as directed within a lead of 50 Mtr. including required all safety provisions etc.: All kinds of soil | 1.00 | Cum |
| 2 | Dismantling of cement concrete pavement for pipe line and chambers by mechanical means using pneumatic tools, cutting the peripheral edge by CC cutter, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 meters. Measurement for dismantled trench to be made as per standard trench width specified in tender document and no extra payment shall be made be made for trench width more than specified, re-handling of material/earth to complete the tasks as per technical specification and scope of work. | 1.00 | Cum |
| 3 | Dismantling of flexible pavement for pipe line and chambers by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 meters. Measurement for dismantled trench to be made as per standard trench width specified in tender document and no extra payment shall be made be made for trench width more than specified, re-handling of material/earth to complete the tasks per technical specification and scope of work. | ||
| 4 | Bituminous courses | 1.00 | Cum |
| 5 | Granular courses | 1.00 | Cum |