Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3562607 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair Maint Servicing Miscellaneous Items And Internal Fitting And Connected Accessories At 153 Gh Under Age Em Ii Of Ge 865 Ews |
| Last Date For Submission | 30th Mar, 2026 |
| Opening Date | 01 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 81000.00 |
| Estimated Cost | 4050000.00 |
| City | LEH |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Comprehensive monthly maintenance of central gas pipe line system comprising of Oxygen,Nitrous and compressed air system of desired pressure required to operation theatre-05 Nos at 153 GH including regular & periodical maintenace/overhauling,replacement of air filters,tail pipe,NRV,pressure control switch,machine belts and shut off valves,attending leakage in gas system etc.including all connected equipments installed for the said purpose having following components of various make/capacity:- (i) Oil free comprssor of capacity 7.5 HP of make Multitech with pressure control switch-02 Nos (ii) Heatless air drier of capacity 30cfm of make Multitech-02 Nos (iii) Automatic control panel for oxygen with alarm system-01 No. (iv) Automatic control panel for Nitrous oxide with alarm system-01 No. (v) 6+6 cylinder Oxygen manifold with NRV & 12 Nos flexible tail pipe-01 No 2+2 cylinder Nitrous oxide manifold with NRV & 04 Nos flexible tail pipe-01 No (vi) Electrical control panel for above compressor (vii) Digital area alarm system of four gases-01 No | 6.00 | Each month |
| 2 | (viii) Parkodex outlet points confirming to HTM-2022/NFPA-99 for oxygen vaccum compressed air & nitrous oxide-44 Nos. (ix) Isolation valve of 28mm,22mm,15mm & 12mm-20 Nos. (x) Backpressure compensated flow meter with humidifier bottles -10 Nos. (xi) Copper pipe line complete of dia 28mm,22mm,15mm & 12mm installed in the OT complex-600 RM (xii) Ward vaccum unit with 2000ml polycarbonate jar-08 Nos. Note:- (i) Contractor shall bound to attend the complaint with in one hour after receiving it from JE and AGE . (ii) Urgent spares shall be readly made available at site during all days by the contractor. Contractor shall bound to check and rectify the all kind of leakages in central gas system meant for operation theatre including oxygen,nitrous and compressed air system and receiver tank including control and central alarm panel of respective gases. | ||
| 3 | Supplying, and fixing Isolation valve with brass connectors of size 12 mm including testing and commissioning complete all as specified. | 20.00 | Each |
| 4 | Supplying, and fixing Isolation valve with brass connectors of size 15 mm including testing and commissioning complete all as specified. | 20.00 | Each |
| 5 | Supplying, and fixing Isolation valve with brass connectors of size 22 mm including testing and commissioning complete all as specified. | 20.00 | Each |
6 Days Left