Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Indo Tibetan Border Police
Tender ID3775629
Organisation NameIndo Tibetan Border Police
Tender BriefProviding And Fixing Gate And Barbed Wire Fencing With Angle Iron Posts And Struts Along Boundary At Karzok Bop Of 37th Bn, Itbp
Last Date For Submission10th Apr, 2026
Opening Date11 Apr, 2026
Cost
Document Cost0.00
EMD33898.00
Estimated Cost1694888.00
Location
CityLeh Ladakh
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.62.30Cum
2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size).4.07Cum
3Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size).17.59Cum
4Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)0.30Cum
5Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)0.38Cum
10th Apr, 2026

21 Days Left