Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3751439 |
|---|---|
| Organisation Name | Uttar Pradesh Small Industries Corporation Limited |
| Tender Brief | Construction Of Boundary Wall Ambedekar Park At Gram Madhupuri Block Jageer Distt. Mainpuri. |
| Last Date For Submission | 25th Mar, 2026 |
| Opening Date | 26 Mar, 2026 |
| Document Cost | 1180.00 |
|---|---|
| EMD | 15000.00 |
| Estimated Cost | 1423165.00 |
| City | Mainpuri |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation of foundation in ordinary soil (loam clay or sand) including lift upto 1.50 mt. And lead upto 30 mt. And including filling watering and ramming of excavated earth into the trenches or into the space between the byilding and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer Incharge upto a distance of 30 m from the foundation trenches.4.1.1 | 85.92 | cum |
| 2 | Concrete with 4 cms guage stone ballast, coarse sand and cement in proportion of 12:6:1 in foundation and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of work.4.1.8 | 10.632 | cum |
| 3 | R.C.C Work with cement approved coarse sand and 2 cms gauge approved stone ballast in the proportion of 1 :1.5 :3 in foundation excluding supply of reinforcement and its binding but in the same with 24 BWGGI binding wire and including the cost of binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T&P etc. required for proper completed of the work. The rate excludes making of drip course which shall be paid extra.5.1.2 | 29.404 | cum |
| 4 | R.C.C Work with cement approved coarse sand and 2 cms gauge approved stone ballast in the proportion of 1 :1.5 :3 in coloumn excluding supply of reinforcement and its binding but in the same with 24 BWGGI binding wire and including the cost of binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T&P etc. required for proper completed of the work. The rate excludes making of drip course which shall be paid extra.5.2.2 | 5.18 | cum |
| 5 | R.C.C Work with cement approved coarse sand and 2 cms gauge approved stone ballast in the proportion of 1 :1.5 : 3 in lighter beam excluding supply of reinforcement and its binding but in the same with 24 BWGGI binding wire and including the cost of binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T&P etc. required for proper completion of the work. The rate excludes making of drip course which shall be paid extra.5.1.2 | 10.05 | cum |
7 Days Left