Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Uttar Pradesh Small Industries Corporation Limited
Tender ID3751439
Organisation NameUttar Pradesh Small Industries Corporation Limited
Tender BriefConstruction Of Boundary Wall Ambedekar Park At Gram Madhupuri Block Jageer Distt. Mainpuri.
Last Date For Submission25th Mar, 2026
Opening Date26 Mar, 2026
Cost
Document Cost1180.00
EMD15000.00
Estimated Cost1423165.00
Location
CityMainpuri
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Excavation of foundation in ordinary soil (loam clay or sand) including lift upto 1.50 mt. And lead upto 30 mt. And including filling watering and ramming of excavated earth into the trenches or into the space between the byilding and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer Incharge upto a distance of 30 m from the foundation trenches.4.1.185.92cum
2Concrete with 4 cms guage stone ballast, coarse sand and cement in proportion of 12:6:1 in foundation and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of work.4.1.810.632cum
3R.C.C Work with cement approved coarse sand and 2 cms gauge approved stone ballast in the proportion of 1 :1.5 :3 in foundation excluding supply of reinforcement and its binding but in the same with 24 BWGGI binding wire and including the cost of binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T&P etc. required for proper completed of the work. The rate excludes making of drip course which shall be paid extra.5.1.229.404cum
4R.C.C Work with cement approved coarse sand and 2 cms gauge approved stone ballast in the proportion of 1 :1.5 :3 in coloumn excluding supply of reinforcement and its binding but in the same with 24 BWGGI binding wire and including the cost of binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T&P etc. required for proper completed of the work. The rate excludes making of drip course which shall be paid extra.5.2.25.18cum
5R.C.C Work with cement approved coarse sand and 2 cms gauge approved stone ballast in the proportion of 1 :1.5 : 3 in lighter beam excluding supply of reinforcement and its binding but in the same with 24 BWGGI binding wire and including the cost of binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T&P etc. required for proper completion of the work. The rate excludes making of drip course which shall be paid extra.5.1.210.05cum
25th Mar, 2026

7 Days Left