Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3635011 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Construction And Renovation Work Of Various Schools In Division Mandalgarh Under Dmft Scheme (package No. Rj-07-83 / Dmft / Mgh / Building / Gc-12 / 2025-26) |
| Last Date For Submission | 24th Mar, 2026 |
| Opening Date | 25 Mar, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 90780.00 |
| Estimated Cost | 4539000.00 |
| City | Mandalgarh |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | PART 'I' CONSTRUCTION OF ONE CLASS ROOM AT GOVT. UPPER PRIMARY SCHOOL BAGGA KA KHERA BLOCK-SUWANA PART "A" CIVIL WORKS Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 72.31 | Cum |
| 2 | Providing and laying in position cement concrete including curing compaction etc. complete in spcified grade excluding the cost of centering and shuttering all work upto plinth level 1:4:8(1 cement:4 Coarse sand :8 graded stone aggregate 40 mm nominal size). | 8.63 | Cum |
| 3 | Providing and laying in position cement concrete including curing compaction etc. complete in spcified grade excluding the cost of centering and shuttering all work upto plinth level 1:4:8(1 cement:4 Coarse sand :8 graded stone aggregate 40 mm nominal size). | 6.71 | Cum |
| 4 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in: Cement Mortar 1:6 ( 1-Cement : 6-Sand). | 27.45 | Cum |
| 5 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for foundation, footings, strap beam, raft, base of column etc | 32.95 | Sqm |
5 Days Left