Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 2998939 |
|---|---|
| Organisation Name | Meerut Development Authority |
| Tender Brief | Road Strengthening Work From Sms College To Hapur Road In Pocket Buddha Enclave, Lohiya Nagar. |
| Last Date For Submission | 6th Mar, 2026 |
| Opening Date | 07 Mar, 2026 |
| Document Cost | 5700.00 |
|---|---|
| EMD | 255000.00 |
| Estimated Cost | 12713000.00 |
| City | Meerut |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | DSR/2023/ 2.31 - Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared..(17.60x 0.7418=13.05) | 2700.00 | Sqm |
| 2 | 2.1.1 Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge | 270.00 | Cum |
| 3 | DSR/2315.43.2 - Dismantling manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of engineer in charge bituminous road 8640.00x0.7418= 317.86 | 4035.00 | Sqm |
| 4 | AR - Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directionsof Engineerin- Charge. With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30 | 1170.75 | Cum |
| 5 | (AR) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers in sub- base / base course on well prepared surface and compacting to achieve the desired density. (Reference of MORT&H 406) (Analysis attached) | 450.00 | Cum |
3 Days Left