Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Narmada Water Resources Water Supply And Kalpsar Department
Tender ID3161938
Organisation NameNarmada Water Resources Water Supply And Kalpsar Department
Tender BriefCorrigendum : Construction Of Barrage, Protection Work & Other Allied Activities Acrossriver Sabarmati At Falu Ta. Vijapur, Dist. Mehsana.
Last Date For Submission12th Mar, 2026
Opening DateRefer to Documents
Cost
Document Cost18000.00
EMD23152000.00
Estimated Cost2315171298.50
Location
CityMehsana
StateGujarat

Register to see full details

BOQ Items
#ItemQtyUnits
1Care and diversion of river including required dewatering during construction of spillway and allied works as prescribed and directed etc. complete.1.000Job.
2Excavation in all sorts of strata and formations including depositing the unuseful excavated stuff as and where directed including sorting and stacking useful materials as required and upto lead of 200mt. And all lifts etc. complete, Excluding dewatering. (a) In Overburden including hardmurrum. (Lead upto 3.00 km)2065763.000Cmt.
3Conducting plate Load Test at various trial pit location providing and creating kentledge, hydraulic jack, deflection measuring dial guage, including using 300 mm, 450 mm or 600 mm size square plate, conducting test as per IS 1888. including shifting of equipment in between various test location including mobilization and demobilization of technical report with clear recommendation of safe bearing pressure etc. complete to the satisfaction of EIC.25.000No.
4Providing and laying cement Concrete (1:4:8) grade for plum concrete using cement and sand with use of concrete batchmix plant including providing & erecting necessary formwork, centering, vibrating, compecting, smooth finishing, watering and curing as directed with all leads and lifts etc. comp.38878.000Cmt.
5Providing and laying in position cement concrete M15 (MSA 20) using cement, Sand and machine crushed course aggregate including providing necessary form work, compaction, finishing and curring as required etc. completed for checkdams. (with Mobile Batching)17561.000Cmt.
12th Mar, 2026

9 Days Left