Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID3781508
Organisation NameMilitary Engineer Services
Tender BriefSpecial Repair To Presidential Drive Road From B Mess Junction To Chq Junction Of Army War College Under Ge Awc Mhow
Last Date For Submission10th Apr, 2026
Opening Date13 Apr, 2026
Cost
Document Cost1000.00
EMD127000.00
Estimated Cost6796000.00
Location
CityMHOW
StateMadhya Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1M&L for Repair to pot holes any depth, not exc 1 sqm each including sweeping free from dust and mud or water, scoring sunken surfaces in roads, paths, etc cutting around edges to at least 25mm in depth, and making good by applying tack coat @ 5 Kgs per 10 Sqm and laying premixed bituminious macadam well rammed and sealed with paving bitumen 60/70 or VG-30 grade@ 9.8 Kgs per 10 Sqm, blinded with 0.09 Cum of stone chipping of size 6.3mm and again well rolled with 8 to 10 tonne power roller (Iincluding supply of pre-mixed macadam, binder and chipping) depth of pot holes exc 30mm complete all as specified and directed.1.00Per Ten Sqm
2M&L for preparation of surfaces of existing black top surface or bituminous macadam surfaces by brushing with wire brushes for removing caked mud etc and sweeping with brooms and finally fanning to clean the surfaces with gunny bags to remove all loose dirt etc on black top/concrete surfaces and applying evenly a priming tack coat with bitumenous primer using paving bitumen at the rate of 5 kg / 10 sqm and applying premixed hot mix Asphaltic Semi Dence Concrete using 5.5% binder content (VG-30 Grade paving bitumen) by weight of total mix and with thickness of 30 mm (consolidated Thickness) including rolling with 8 to 10 tonne power road roller to uniform and smooth surface and consolidation to required gradient and camber all as specified and directed.1393.64Per Ten Sqm
3Note1 : (a) Cement shall be used as filler at mininum 2% by weight of total mix in event of variation in design mix the percentage of filler content shall be on plus side adopted. (b)SDAC shall be as per MORTH specification Note2: - (i) Laying shall be done by means of self-propelled mechanical paver, and screed temp minimum maintain not less than 140 degree cellicious finishing with electronic sensor and hydraulic controls with suitable speed 5 Km /hour and capable of laying, spreading, tamping and finishing. (ii) Mix shall be obtained from computerized hot mix plant and spreading shall be done by using mechanical paver only) (iii) The mix shall be designed by job mix formula and approved by GE. (iv) Cost of testing charges, materials and transportation etc for job mix formula and Independent testing during execution of work shall be inclusive in the unit rate quoted and no extra payment shall be made on this account. (v) Minimum bitumen content as mentioned in above item, if there is any variation in the actual binder content used, the rate shall be adjusted @ Rs. 50 /- per Kg of binder used. However no price adjustment shall be made if the binder content works out to more than 5.5% as specified in BOQ. (vi) Prior to the execution of work started the Design mix of bituminous permix semi dense asphaltic concrete should be provide by the contractor from any Governement Engineering College or approved NABL lab and job mix should be approved by GE. (vii) Filler material for semi dense asphaltic concrete shall be cement only. (viii) The cost of Job mix & Lab/Feild Testing asper SSR/IS/MORTH as required shall be borne by the contractor. (ix) The hot mix plant should be approved from GE.
4M&L for premix bituminous macadam (consolidated thickness not more than 75 mm) with 4% binder content of paving bitumen of grade (VG-30) by weight of total mix laid and rolled with 8-10 tonne power roller to required gradient and camber up to outer edges of roads on existing black top surfaces complete all as specified and directed. 206.52Cum
5Notes:- (a) Aggregate used in the work shall be obtained from approved source . (b) Minimum content of Cement filler shall be 2% by weight of total mix and dossage shall be as per design mix. No price adjustment shall be applicable if excess quantity of filler is used/approved due to design requirement in the execution of work under this item (c) No price adjustment shall be made for any extra quantity of binder due to design requirement. (d).Cost of testing charges as per (IS),Preparation of moulds,penetration test, Viscosity test,Bitumin extraction test ,, Marshall stability test not less than 1200kg using hot mix plant, spread, rolled and consolidated to required gradient and camber using mechanical sensor paver and roller of type & capacity all as specified in MoRTH and TI 09/2009 . core cutting, materials and transpotation etc for job mix formula shall deem to be included in quoted rate) . (e) Mix shall be from hot mix plant and laying shall be done with mechanical paver. (f) During the laying minimm 02 x water browser shall be available at site .
10th Apr, 2026

21 Days Left