Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Forest Department
Tender ID3775131
Organisation NameForest Department
Tender BriefConstruction Of Entry Gate No. 4 Deshu Peak Kufri (theog Division)
Last Date For Submission3rd Apr, 2026
Opening Date06 Apr, 2026
Cost
Document Cost500.00
EMD18666.00
Estimated Cost0.00
Location
CityMulti city
StateHimachal Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by mechanical means (Hydraulic excavator) / Manual means in over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth all lead lift and sorting out useful and unuseful material and transportation of unuseful material for disposing at dumping site (To be arranged by contractor) as Directed by DFOTheog. All kind of Soils14.950Per cubic meter
2Earth work in excavation by mechanical means(Hydraulic excavator)/ manual means in foundation and trenches (exceeding 30 cm in depth, 1.5 m in width as well s 10sqm on plan) including getting out and disposal of excavated earth all lead lift and sorting out useful and unuseful material and transportation of unuseful material for disposing at dumping site ( To be arranged by contractor) as Directed by DFO Theog.17.500Per cubic meter
3Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:5:10 (1 cement: 5 fine sands: 10 graded stone aggregate 40mm nominal size) complete including carriage of materials within all leads and lifts as per direction of DFO Theog.1.500Per cubic meter
4Centering ad shuttering including strutting, propping etc. and removal of form work for: Foundation, footings and bases for columns.14.300Per cubic meter
5Supplying, filling, spreading & leveling stone boulders of size range 5cm to 20 cm, in recharge pit, foundations under plinths, floors etc. in the required thickness, and ramming and compacting manually for all leads & lifts, all complete as per direction of DFO Theog.14.580Per cubic meter
3rd Apr, 2026

14 Days Left