Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3775131 |
|---|---|
| Organisation Name | Forest Department |
| Tender Brief | Construction Of Entry Gate No. 4 Deshu Peak Kufri (theog Division) |
| Last Date For Submission | 3rd Apr, 2026 |
| Opening Date | 06 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 18666.00 |
| Estimated Cost | 0.00 |
| City | Multi city |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / Manual means in over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth all lead lift and sorting out useful and unuseful material and transportation of unuseful material for disposing at dumping site (To be arranged by contractor) as Directed by DFOTheog. All kind of Soils | 14.950 | Per cubic meter |
| 2 | Earth work in excavation by mechanical means(Hydraulic excavator)/ manual means in foundation and trenches (exceeding 30 cm in depth, 1.5 m in width as well s 10sqm on plan) including getting out and disposal of excavated earth all lead lift and sorting out useful and unuseful material and transportation of unuseful material for disposing at dumping site ( To be arranged by contractor) as Directed by DFO Theog. | 17.500 | Per cubic meter |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:5:10 (1 cement: 5 fine sands: 10 graded stone aggregate 40mm nominal size) complete including carriage of materials within all leads and lifts as per direction of DFO Theog. | 1.500 | Per cubic meter |
| 4 | Centering ad shuttering including strutting, propping etc. and removal of form work for: Foundation, footings and bases for columns. | 14.300 | Per cubic meter |
| 5 | Supplying, filling, spreading & leveling stone boulders of size range 5cm to 20 cm, in recharge pit, foundations under plinths, floors etc. in the required thickness, and ramming and compacting manually for all leads & lifts, all complete as per direction of DFO Theog. | 14.580 | Per cubic meter |
14 Days Left