Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Deendayal Port Trust
Tender ID2909194
Organisation NameDeendayal Port Trust
Tender BriefCorrigendum : Beautification Of Gopalpuri Colony (widening Of The Entry Gate And Enhancement Of Surrounding Approaches).
Last Date For Submission13th Mar, 2026
Opening DateRefer to Documents
Cost
Document Cost1770.00
EMD1373590.00
Estimated Cost68679521.00
Location
CityMulti city
StateGujarat

Register to see full details

BOQ Items
#ItemQtyUnits
1Dismantling the existing security cabin/entry gate/road side drain/compound wall including removing / separating out the salvage materials like doors & windows masonary, reinforcement etc as & where position complete including removing the foundation and filling the unwanted material outside Gopalpuri upto 4 km lead, prepare the surface for reconstruction of the beautification of gopalpuri main gate & approch as directed by the Engineer-in-charge . (Measurement will be done based on slab area)288.000M2
2"Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, All kinds of soil. /filled material/ Road crust consisting of bitumen surface and metallling etc as directed by engineer-in-charge."3321.000M3
3Taking out existing CC interlocking paver blocks from footpath with kerb stone/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.1629.000M2
4Disposal of excavated material lead upto 2 km beyond 1.5 km and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil. /filled material/ Road crust consisting of bitumen surface and metallling etc.2159.000M3
5Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.830.000M3
13th Mar, 2026

6 Days Left