Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3519068 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Cleaning Of Sewage Line Septic Tank And Soakage Well And Miscellaneous Br Works Of Sector B At Leh Under Age Br Ii Of Ge 865 Ews |
| Last Date For Submission | 23rd Mar, 2026 |
| Opening Date | 25 Mar, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 98800.00 |
| Estimated Cost | 4940000.00 |
| City | Multi city |
|---|---|
| State | Multi State |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | M&L for cleaning of septic tanks (any capacity) by dewatering septic water etc.to a distance n.exc 50m and burying in pits and refilling the same complete all as spfd and directed by Engg-in charge. NOTE: The cost for excavation and earth work for pits is deemed to be included in the unit rate. | 1825.00 | Cum |
| 2 | M&L for cleaning of Soakage Well (any capacity) by dewatering septic water etc.to a distance n.exc 50m and burying in pits and refilling the same complete all as spfd and directed by Engg-in charge. NOTE: The cost for excavation and earth work for pits is deemed to be included in the unit rate. | 1500.00 | Cum |
| 3 | M&L for cleaning of septic tanks (any capacity) by desludging sludge and removing sludge waste material etc.toadistance n.exc 50m and burying in pits and refilling the same complete all as spfd and directed. NOTE: The cost for excavation and earth work for pits is deemed to be included in the unit rate. | 1000.00 | Cum |
| 4 | M&L for cleaning of gully traps of any size and removing sludge waste material etc.toa distance n.exc 50m and burying in pits and refilling the same complete all as spfd and directed. NOTE: The cost for excavation and earth work for pits is deemed to be included in the unit rate. | 245.00 | Each |
| 5 | M&L for cleaning of drain pipes 100mm to 200 mm bore by roding from manhole to manhole to septic tank or vice vers and well flushing with water after cleaning and removing waste material to a distance n.exc 50m and burying in pits and refilling the same complete all as spfd and directed by Engg-in charge. NOTE: The cost for excavation and earth work for pits is deemed to be included in the unit rate. | 1700.00 | Rm |
4 Days Left