| Tender ID | 3555649 |
|---|---|
| Organisation Name | Northern Coalfields Limited |
| Tender Brief | Corrigendum : Cleaning Of Siltation Ponds And Cleaning Of Garland Drains And Connecting Drain In Mine And Workshop At Jhingurda Project |
| Last Date For Submission | 23rd Mar, 2026 |
| Opening Date | 24 Mar, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 105700.00 |
| Estimated Cost | 8448449.00 |
| City | Multi city |
|---|---|
| State | Multi State |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation in all kind of soil/ silt by mechanical means (hydraulic excavaror)/ manual means including dozering, trasnportation, unloading at designated place, levelling and dressing of dump sites all inclusive as per instructions of EIC. with all lifts (for all project of NCL) Lead upto 50.00 m | 76565.00 | cum |
| 2 | Earth work in excavation in all kind of soil/ silt by mechanical means (hydraulic excavaror)/ manual means including dozering, trasnportation, unloading at designated place, levelling and dressing of dump sites all inclusive as per instructions of EIC. with all lifts (for all project of NCL) Lead upto 1.00 KM | 86980.00 | cum |
| 3 | Earth work in excavation in rock all operation mechanically with all lifts including drilling, Dozering, levelling and dressing of dump sites complete as per instructions of EIC. (for all project of NCL) *Blasting (incl materials) will be done departmentally, no extra amount will be paid to contractor. Lead upto 1.00 KM | 2880.00 | cum |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil | 8550.00 | cum |
| 5 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 24300.00 | sqm |