Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3586934 |
|---|---|
| Organisation Name | Northern Coalfields Limited |
| Tender Brief | Corrigendum : Concreting, Painting And Numbering Of Electric Poles At Chp, Dudhichua Project. |
| Last Date For Submission | 20th Mar, 2026 |
| Opening Date | 21 Mar, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 4700.00 |
| Estimated Cost | 372738.00 |
| City | Multi city |
|---|---|
| State | Multi State |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Painting with aluminium paint of approved brand and manufacturer to give an even shade ( two or more coats on new work ) . Area of a) Tubular pole: (11 mtr =4.955 sq mtr) (Area of brackets and clamp = 0.906 sqmtr ) Total surface area of each pole with bracket and clamp = 4.955 + 0.906 = 5.861 sq mtr. Total area of 221 nos poles with bracket and clamp = 221 X 5.861 = 1295.30 Sq mtr. b)Lighting towers: installed in CHP premises (surface area 9 nos of 20 mtr tower =124.44 sq mtr x 9 = 1120 sq mtr ) (surface area 2 nos of 11 mtr tower =133 sq mtr x 2 = 266 sq mtr ) total surface area of the towers =1120 + 266 =1386 sq mtr. Total area to be painted (a+b) = 1295.30 +1386 = 2681.30 sq mtr | 2681.3 | Sq.Mtr. |
| 2 | Fabrication of MS channel, support angle, flat in shape of clamp as per requirement ( for preparing of anti climbing device and light mounting bracket) | 600 | Kg |
| 3 | Earthing with copper earth plate 600 mm X 600 mm X 3 mm thick including accessories and provding masonry enclosure with cover plate having locking arrangement and watering pipe 2.7 mtr long etc with charcoal/coke and salt as required. | 10 | No. |
| 4 | Providing and fixing of HT danger notice plate of 250 mm X 200 mm, made of mild steel, at least 2 mm thick and vitreous enameled white on both sides and with encription in single red color on front side as required. | 200 | No. |
| 5 | a)Concreting of pole pit, Muffing of poles upto (height 45 cms dia 80 cm)= ((3.14*0.4*0.4) -(3.14*0.15*0.15))x .45 = 0.1943 cu m x 221 poles = 42.94 Cu mtr b) Concreting of lighting towers = 48 Cu mtr Total concreting (pcc) required (a+b) = 42.94 +48 = 90.94 Cu Mtr | 90.94 | Cu.Mtr. |
3 Days Left