Tender ID3677010
Organisation NameZilla Parishad
Tender BriefCorrigendum : Construction Of Drain From H/o. Shakib Shaw Towards H/o. 4no. Asthal At Sansad No. - Xxvi, P. S. No.-220 Under Ukhra Gram Panchayat Under Apas,
Last Date For Submission24th Mar, 2026
Opening Date25 Mar, 2026
Cost
Document Cost250.00
EMD1440.00
Estimated Cost72000.00
Location
CityMulti city
StateWest Bengal

Register to see full details

BOQ Items
#ItemQtyUnits
1Cleaning rubbish, sludge, weeds, scum, liquid earth, mud etc. from roadside masonary drain/ humepipe drain/ culvert etc. by mathor labour after removing concrete. Slab/ manhole cover etc. without damaging the same and refixing the same properly after cleaning as necessary and removing the sludge etc. by using ironpans, buckets including all labour, tools & plants including removing the spoils in dry condition and disposing the same by truck beyond the roadside including loading into truck and cleaning the roadside in all respect.2.330Cu. m.
2Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.1.550Cu. m.
3Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge1.550Cu. m.
4Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils with in a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.4.660Cu. m.
5Fine Sand filling in foundation or plinth in layers not exceeding 15cm. consolidating same by thorough saturation with water and ramming complete, including the cost of supply of sand.1.160Cu. m.
24th Mar, 2026

4 Days Left