| Tender ID | 3676801 |
|---|---|
| Organisation Name | Zilla Parishad |
| Tender Brief | Corrigendum : Construction Of M. Well Over Head Tank And Pipeline At Bibekananda Sishu Uddyan At Sansad No.-xix Under Ukhra Gram Panchayat Under 15th Fc (bg) Cfcg, Scheme Code No.- (109953803)15th Fc (bg) Cfcg/ugp/2025-26. |
| Last Date For Submission | 24th Mar, 2026 |
| Opening Date | 25 Mar, 2026 |
| Document Cost | 250.00 |
|---|---|
| EMD | 3400.00 |
| Estimated Cost | 170000.00 |
| City | Multi city |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Digging earth in any soil including mixed soil but excluding moorum, laterite sand stone or any other hard stone including spreading or stacking the spoils within a lead of 75 metres as directed bailing out water upto 1 metre depth, shoring etc., when and if required and back filling with fine sand ( including cost of sand) on completion of steining works i) 2.4 metre diameter of digging for 1.5 metre internal diameter of well. a) upto 3.0 m. below G.L. add 5% extra for mooram. | 3.000 | M. |
| 2 | Digging earth in any soil including mixed soil but excluding moorum, laterite sand stone or any other hard stone including spreading or stacking the spoils within a lead of 75 metres as directed bailing out water upto 1 metre depth, shoring etc., when and if required and back filling with fine sand ( including cost of sand) on completion of steining works i) 2.4 metre diameter of digging for 1.5 metre internal diameter of well. b) beyond 3.0 m.upto 6.0 m. below add 100% extra for laterite rock or sand stone cutting | 3.000 | M. |
| 3 | Digging earth in any soil including mixed soil but excluding moorum, laterite sand stone or any other hard stone including spreading or stacking the spoils within a lead of 75 metres as directed bailing out water upto 1 metre depth, shoring etc., when and if required and back filling with fine sand ( including cost of sand) on completion of steining works i) 2.4 metre diameter of digging for 1.5 metre internal diameter of well. c) beyond 6.0 m.upto 9.0 m. below add 100% extra for laterite rock or sand stone cutting | 3.000 | M. |
| 4 | Digging earth in any soil including mixed soil but excluding moorum, laterite sand stone or any other hard stone including spreading or stacking the spoils within a lead of 75 metres as directed bailing out water upto 1 metre depth, shoring etc., when and if required and back filling with fine sand ( including cost of sand) on completion of steining works i) 2.4 metre diameter of digging for 1.5 metre internal diameter of well. d) beyond 9.0 m.upto 12 m. below add 100% extra for laterite rock or sand stone cutting | 3.000 | M. |
| 5 | Digging earth in any soil including mixed soil but excluding moorum, laterite sand stone or any other hard stone including spreading or stacking the spoils within a lead of 75 metres as directed bailing out water upto 1 metre depth, shoring etc., when and if required and back filling with fine sand ( including cost of sand) on completion of steining works i) 2.4 metre diameter of digging for 1.5 metre internal diameter of well. e) Beyond 12 metre upto 15 metre below G.L. add 100% extra for laterite rock or sand stone cutting | 2.500 | M. |