Tendering Authority: Yamuna Expressway Industrial Development Authority
Tender ID3677832
Organisation NameYamuna Expressway Industrial Development Authority
Tender BriefCorrigendum : Construction Of Main Road Patri Side Brick Kharanja Work And Other Galli C.c. Road Work (including Construction Of Drain) In Village - Sahab Nagar, Yea Wc-06
Last Date For Submission27th Mar, 2026
Opening Date30 Mar, 2026
Cost
Document Cost1782.00
EMD120500.00
Estimated Cost6014808.00
Location
CityMulti city
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 Sq.M on plan) including dressing of sides and ramming ob bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, withen a lead of 50m. Depth From 0.0 to 1.5 M below G.L.61.63Cum
2Cement concrete with 4cm Guage Approved Stone ballast , Coarse Sand& Cement in the proportion of 8:4:1 including Supply of all material, Labour, Tools & Plants etc required for Proper completion of the work. UPPWD/SOR/281/P-17106.70Cum
3M-150 brick work in 1:4 cement and coarse sand of ( 2.2 fineness modulous) mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work .81.67Cum
4concrete with 2cm Guage Stone grit , Coarse Sand& Cement in the proportion of 4:2:1 including Supply of all material, Labour, Tools & Plants etc required for Proper completion of the work. UPPWD/SOR/279a/P-1720.21Cum
5Earth work in rough excavation , banking excavaated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with 1/2 tonnes roller or wooden or steel rammer and rolling every 3rd and top most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, all leads as per ( A.R. ) For all kind of soil. Construction of embankment with approved material obtained from borrow pits with all lift and leads transporting to site spreading ,grading to required slope and compacting to meet requirement of table 300-2 up to 5 km Morth 2019/3.16/3051240.80Cum
27th Mar, 2026

7 Days Left