Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3611481 |
|---|---|
| Organisation Name | Directorate Of Local Bodies |
| Tender Brief | Corrigendum : Mohalla-sardar Patelnagar (dhelmau) Me Taj Mohammad Ke Makan Se Babar Ke Khet Tak Returningwall And C.c. Road Ka Nirman Karya. |
| Last Date For Submission | 25th Mar, 2026 |
| Opening Date | 27 Mar, 2026 |
| Document Cost | 1925.00 |
|---|---|
| EMD | 163114.00 |
| Estimated Cost | 1631141.00 |
| City | Multi city |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, stone screening/binding material to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. | 34.11 | cum |
| 2 | Earth work in Foundation in ordinary soil, excavation to be in the form of regular pit not exceeding 1/2 metre (20'') in depth and earthwork in embankment to be 20 cm (8'') layers including ramming and dressing the surface to required levels and slopes and also including 1.5 mts lead. The earth form cutting to be used in making embankment or to be desposited on spoil banks withen 30 m. (100 ft.) distance as directed by the Engineer-in-charge Excluding Royalty. | 169.81 | cum |
| 3 | Providing and laying Cement concrete 1:4:8( 1 cement :4 fine sand : 8 graded brick ballast 40 mm. nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. | 28.30 | cum |
| 4 | First class bricks work in 1:4 in cement and fine sand of 1.25 F.M. mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. | 137.13 | cum |
| 5 | 12 mm thick plaster with cement mortar in proportion of 1:2 cement and fine sand of 1.25 F.M. | 238.50 | sqm |
1 Days Left