Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3071623 |
|---|---|
| Organisation Name | Gorkhaland Territorial Administration |
| Tender Brief | Corrigendum : Package 5 Recovery And Reconstruction Of Road At Different Location At Takdah Teesta Valley Samasty Under Takdah Engineering Division, Gta. |
| Last Date For Submission | 1st Apr, 2026 |
| Opening Date | 04 Apr, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 38155.00 |
| Estimated Cost | 1907742.00 |
| City | Multi city |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | (A) REOVERY AND RECONSTRUCTION OF ROAD CHAP GOLAI TO ALLY GAON 10 NO WARD UNDER TAKDAH ENGINEERING DIVISION Earth work in excavation of foundation trenches or drains,in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches,levelling, dressing and ramming the bottom,bailing out water as required complete.(b) Depth of excavation dditional depth beyond 1500 mm and up to 3000mm but not requiring shoring. | 76.72 | cum |
| 2 | Labour for laying 150 mm to 200 mm boulder soling including rough `-- Do -- -- Do - without rolling but including ramming. | 70.98 | sqm |
| 3 | Cost of Stone Boulder 150 mm of N. Bengal variety delivered and stack at site | 10.65 | cum |
| 4 | Plum concrete work with 40% cement concrete with 30 mm down graded stone metal and 60% stone boulder of size 150mm and above,placed in position as directed excluding shuttering if any. | 89.10 | cum |
| 5 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns,lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-in-Charge | 188.48 | sqm |
18 Days Left