| 1 | Providing & applying 1st quality ready mixed synthetic enamel paint in two or more coats with dry film thickness not less than 80 microns of approved make and shade (Asian, Berger, Nerolac, British, Garware paints or equivalent) on Steel structures erected in position consisting of various members like columns, floor beams, cable racks, monorail beams, roof trusses, purlins, equipment supports, ladders, ladder cages, staircases, walkways, pipe supports etc. at all locations and heights (up to 75 meters) to give an even shade including providing and fixing scaffolding, safety belts, safety net, all required PPE's and all necessary arrangements for safe execution of the job as per tender conditions, specifications and as directed by EIC. It also includes surface preparation by cleaning the entire surface, removing rust, oil, grease, dust, deteriorated old paint etc., rubbing surface with wire brushes & emery paper to remove loose scales and deteriorated old paint, wiping surface with with mineral turpentine to remove grease and allowed to dry before painting etc. all complete as per specifications and as directed by the Engineer.
Note:
1) The painting work will be done in two successive coats, with the first coat being a slightly lighter shade than the next coat.
2.) Since the painting work is to be carried out in industrial area, all necessary arrangements are required to carry out to protect all equipments, pipelines etc. in the close vicinity of the working area from colour spray/splashes/droplets. Without proper arrangement to prevent above situation, work will not be permitted and delay due to this will be considered completely on behalf of contractor only and accordingly necessary action will be taken as per agreement terms and condition.
3) Painting is to be carried out using painting brush/roller mainly, however based on the site requirement and as directed by EIC, Air less Spray gun is to be used for painting.
4) Minimum paint consumption shall be as per the recommendation of manufacturer for the sprecified thickness.
| 830.00 | Tonne |
| 2 | Providing and applying one or more coats of 1st quality ready mixed synthetic enamel paint (Dry film thickness not less than 40 microns - Paint Consumption shall be as per the recommendations of the manufacturer for the specified thickness) of approved make and shade (Asian , Berger, Nerolac, British, Garware paints or equivalent) on M.S. Gratings made out of 32mm / 12mm wide flats in position at all locations and heights (up to 75mtr) using spray gun, for the platforms, walkways, staircase landings, treads etc. to give an even shade including providing and fixing scaffolding, safety belts, safety net, all required PPE's and all necessary arrangements for safe execution of the job as per tender conditions, specifications and as directed by EIC. It also includes surface preparation by cleaning the entire surface, removing rust, oil, grease, dust, deteriorated old paint etc., rubbing surface with wire brushes & emerypaper to remove loose scales and deteriorated old paint, wiping surface with mineral turpentine to remove grease and allowed to dry before painting etc. complete as per specifications and as directed by the Engineer.
Note:
1). Painting shall be done with Airless spray gun.
2). Plan area of the grating (i.e. Length X Breadth) - Top side Flat measurements only shall be measured for payment towards over all painting of the grill on all sides and depths of all members. Rate shall be quoted accordingly.
3.) Since the painting work is to be carried out in industrial area, all necessary arrangements are required to carry out to protect all equipments, pipelines etc. in the close vicinity of the working area from colour spray/splashes/droplets. Without proper arrangement to prevent above situation, work will not be permitted and delay due to this will be considered completely on behalf of contractor only and accordingly necessary action will be taken as per agreement terms and condition.
| 2950.00 | Sqm |
| 3 | Providing and applying two or more coats of 1st quality ready mixed synthetic enamel paint (Dry film thickness not less than 80 microns - Paint Consumption shall be as per the recommendations of the manufacturer for the specified thickness) of approved make and shade (Asian , Berger, Nerolac, British, Garware paints or equivalent) on M.S. Hand Railing pipes erected in position consisting of 32mm dia MS Top and middle pipes and vertical posts at varying C/C spacing, Toe plates of all shapes and sizes at all locations and heights (up to 75 mtr) for staircases, walkways, landing, platforms etc. with paint brush to give an even shade including providing and fixing scaffolding, safety belts, safety net, all required PPE's and all necessary arrangements for safe execution of the job as per tender conditions, specifications and as directed by EIC. It also includes surface preparation by cleaning the entire surface, removing rust, oil, grease, dust, deteriorated old paint etc., rubbing surface with wire brushes & emerypaper to remove loose scales and deteriorated old paint, wiping surface with with mineral turpentine to remove grease and allowed to dry before painting etc. complete as per specifications and as directed by the Engineer.
Note:
1. Running meter length of pipe will be measured for payment.
2. Since the painting work is to be carried out in industrial area, all necessary arrangements are required to carry out to protect all equipments, pipelines etc. in the close vicinity of the working area from colour drops/splashes. Without proper arrangement to prevent above situation, work will not be permitted and delay due to this will be considered completely on behalf of contractor only and accordingly necessary action will be taken as per agreement terms and condition.
| 3170.00 | RM |
| 4 | Providing and applying one coat of suitable primer over steel structures as base coat for painting with synthetic enamel paint/Chlorinated rubber paint (Dry film thickness 40 Microns - as per the existing paint whenever required at all locations and heights (up to 75 meters) to give an even shade including providing and fixing scaffolding, safety belts, safety net, all required PPE's and all necessary arrangements for safe execution of the job as per tender conditions, specifications and as directed by EIC.
Note:
1) Painting is to be carried out using painting brush/roller mainly, however based on the site requirement and as directed by EIC, Air less Spray gun is to be used for painting.
2) Primer Consumption shall be as per the recommendations of the manufacturer for the specified thickness.
3.) Since the painting work is to be carried out in industrial area, all necessary arrangements are required to carry out to protect all equipments, pipelines etc. in the close vicinity of the working area from colour spray/splashes/droplets. Without proper arrangement to prevent above situation, work will not be permitted and delay due to this will be considered completely on behalf of contractor only and accordingly necessary action will be taken as per agreement terms and condition. | 83.00 | Tonne |
| 5 | Providing & applying Two or more coats 1st quality ready mixed chlorinated rubber resin based paint of approved make and shade (Asian , Berger, Nerolac, British, Garware paints or equivalent) on old Steel Structures erected in position consisting of various structures like columns, floor beams, cable racks, monorail beams, roof trusses, purlins, equipment supports, ladders, ladder cages, staircases, walkways, pipe supports etc. at all locations and heights (up to 25 meters) to give an even shade including providing and fixing scaffolding, safety belts, safety net, all required PPE's and all necessary arrangements for safe execution of the job as per tender conditions, specifications and as directed by EIC. It also includes surface preparation by cleaning the entire surface, removing rust, oil, grease, dust, deteriorated old paint etc., rubbing surface with wire brushes & emerypaper to remove loose scales and deteriorated old paint, wiping surface with with mineral turpentine to remove grease and allowed to dry before painting etc. complete as per specifications and as directed by the Engineer.
Note:
1) The painting work will be done in two successive coats, with the first coat being a slightly lighter shade than the next coat.
2.) Since the painting work is to be carried out in industrial area, all necessary arrangements are required to carry out to protect all equipments, pipelines etc. in the close vicinity of the working area from colour spray/splashes/droplets. Without proper arrangement to prevent above situation, work will not be permitted and delay due to this will be considered completely on behalf of contractor only and accordingly necessary action will be taken as per agreement terms and condition.
3) Painting is to be carried out using painting brush/roller mainly, however based on the site requirement and as directed by EIC, Air less Spray gun is to be used for painting.
4) Minimum paint consumption shall be as per the recommendation of manufacturer for the sprecified thickness. | 550.00 | Tonne |