Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Assam Rifles
Tender ID3528327
Organisation NameAssam Rifles
Tender BriefCorrigendum : Provision Of Water Supply Scheme At Cob Chieswema Of 45 Assam Rifles
Last Date For Submission27th Mar, 2026
Opening Date28 Mar, 2026
Cost
Document Cost1000.00
EMD45200.00
Estimated Cost2256000.00
Location
CityMulti city
StateMulti State

Register to see full details

BOQ Items
#ItemQtyUnits
1SCHEDULE A PART-I (WATER SUPPLY SCHEME AT CHIESWEMA)
2M/L for carrying out Geo physical survey for ground water exploration for electrical resistivity technique at different location spread at suitable intervals to find out delineation of lithological features of area thickness of layers and most favoragle site for ground water strata based on geo-logical parameters and deposition of sub surface formation aquifer upto the depth of 200 Mtrs and submit a detailed report in regards (02 spot in each location)1Job
3Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer-in-charge, upto 90 metre depth below ground level. All type of soil, 300 mm dia90Metre
4Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer -in-charge, beyond 90 metre & upto 150 metre depth below ground level.Rocky strata including Boulders, 300 mm dia120Metre
5Supplying, filling, spreading & leveling gravels of size range 5 mm to 10 mm, in the recharge pit, over the existing layer of boulders, in required thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge.6.990cum
27th Mar, 2026

8 Days Left