Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Madhya Pradesh Power Generating Company Limited
Tender ID3072733
Organisation NameMadhya Pradesh Power Generating Company Limited
Tender BriefCorrigendum : Renovation Of Bath And Toilet Room Including Floor Polishing Of Passage Of New Guest House At Thp Colony Mppgcl, Sirmour.
Last Date For Submission24th Mar, 2026
Opening Date26 Mar, 2026
Cost
Document Cost500.00
EMD18500.00
Estimated Cost921000.00
Location
CityMulti city
StateMadhya Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Item 15.11.1 - Dismantling tile/ Kota stone/ Marble / Granite work in floors/walls and roofs laid in cement mortar including stacking material within 50 metres lead. For Thickness of Tiles 10mm to 25 mm260M2
2Item 15.14.1 - Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead :Of area 3 sq. metres and below.8.5Sqm
3Item 14.1 - Repairs to plaster of thickness 12mm to 20mm in patches of area 2.5 sq. metres and under including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50metres lead : With cement mortar 1:4 (1 cement : 4 sand).5Sqm
4Item 11.52 - Providing and laying rectified Glazed Ceramic wall tiles 300x450 mm or more (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in all colours white, ivory, grey, fume red brown laid on 12 mm thick cement mortar 1:3 (1 Cement : 3 sand) including grouting the joints with white cement and matching pigments etc., complete.390Sqm
5Item 2.7.1 - Earth work in excavation/ by mechanical means (Hydraulic Excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including dressing of sides and ramming of bottom disposal of excavated earth, Note:-Excavation of hard rock shall be the property of the contractor subject to recovery. excavated material has to shift from site within 15 days after instruction issued by Engineer-In Charge otherwise after this penalty will imposed on contractor at the rate of Rs 50 per cum per day.Ordinary rock0.2Cum
24th Mar, 2026

7 Days Left