| Tender ID | 3150362 |
|---|---|
| Organisation Name | Bhabha Atomic Research Centre |
| Tender Brief | Corrigendum : Repair, Strengthening, Waterproofing And Painting Of Saucer Tank At South Site, Barc, Trombay, Mumbai. |
| Last Date For Submission | 20th Mar, 2026 |
| Opening Date | 25 Mar, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 392265.00 |
| Estimated Cost | 16621357.00 |
| City | Multi city |
|---|---|
| State | Multi State |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge.- From 0.00 to 1.50 m depth from Average Ground Level | 10.00 | CuM |
| 2 | Lead charges for lead Exceeding 2 KM but not exceeding 3 KM, by mechanical transport including loading, unloading, stacking / levelling etc.- Debris Beyond 2 Km but up to and including 3 km. Notes : 1. The rates are applicable for NET Quantities arrived after making deduction for voids @ 30% from corresponding TRUCK Measurement. 2. Finding authorised ground for disposing debries, transporting of debries at disposal ground, disposing, stacking, leveling & statutory charges if any will be responsibility of the Contractor and no extra charges shall be paid for the same. The debris from identified area shall be cleared every week after accumulation of minimum one Truck Load. | 15.00 | CuM |
| 3 | Lead charges for lead exceeding 2 KM but not exceeding 3 KM, by mechanical transport including loading, unloading, stacking / levelling etc.- For Soil Notes : 1. The rates are applicable for NET Quantities arrived after making deduction for voids @ 30% from corresponding TRUCK Measurement. 2. Finding authorised ground for disposing debries, transporting of debries at disposal ground, disposing, stacking, leveling & statutory charges if any will be responsibility of the Contractor and no extra charges shall be paid for the same. The debris from identified area shall be cleared every week after accumulation of minimum one Truck Load. | 10.00 | CuM |
| 4 | Providing and laying in position cement concrete of 1:3:6 (1 cement, 3 crushed sand, 6 graded stone aggregate of maximum size 20 mm) including consolidation, finishing, curing etc. complete as per specificationsand drawings but excluding the cost of Form work shuttering, centering Complete at all levels | 20.00 | CuM |
| 5 | Providing , centering ,shuttering Form work using PVC film faced plywood to get a neat form finish surface for all types of structures including necessary strutting, proping, staging, supports etc and deshuttering the same after the specified time all as per drawings, specifications and as directed by the Engineer-in-charge at all levels. For Super Structure | 200.00 | SqM |