Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3676578 |
|---|---|
| Organisation Name | Zilla Parishad |
| Tender Brief | Corrigendum : Repairing And Cleaning Of Drain From H/o. Shiba Shaw Culvert Towards Rail Line At Sansad No. - X, P. S. No.-204 Under Ukhra Gram Panchayat Under Apas, |
| Last Date For Submission | 24th Mar, 2026 |
| Opening Date | 25 Mar, 2026 |
| Document Cost | 250.00 |
|---|---|
| EMD | 1461.00 |
| Estimated Cost | 73063.00 |
| City | Multi city |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. | 0.820 | Cu. m. |
| 2 | Cleaning rubbish, sludge, weeds, scum, liquid earth, mud etc. from roadside masonary drain/ humepipe drain/ culvert etc. by mathor labour after removing concrete. Slab/ manhole cover etc. without damaging the same and refixing the same properly after cleaning as necessary and removing the sludge etc. by using ironpans, buckets including all labour, tools & plants including removing the spoils in dry condition and disposing the same by truck beyond the roadside including loading into truck and cleaning the roadside in all respect. | 8.240 | Cu. m. |
| 3 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils with in a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 8.240 | Cu. m. |
| 4 | Fine Sand filling in foundation or plinth in layers not exceeding 15cm. consolidating same by thorough saturation with water and ramming complete, including the cost of supply of sand. | 0.620 | Cu. m. |
| 5 | Single Brick Flat soling of Picked Jhamma Bricks including ramming and dressing bed to proper level and filling joints with local sand including cost of sand. | 3.660 | Sq. m. |
4 Days Left