Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3725675 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Restoration Of Rain Damages On Link Road Jole To Kaint Via Bhooran , Amroh, Dhrun,kuhroo ,sanjot Road At Km. 0/0 To 14/255 (sh. Construction of Retaining Wall At Rd 13/700 To 13/713) Against Dc Deposit. |
| Last Date For Submission | 25th Mar, 2026 |
| Opening Date | 25 Mar, 2026 |
| Document Cost | 350.00 |
|---|---|
| EMD | 12800.00 |
| Estimated Cost | 638110.00 |
| City | Multi city |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in earth work in foundation and trenches etcetera in all kind and classification of soil such as pick work, jumper work, pick jumper work, blasting work and hard blasting work and saturated soil any other mixed verity of soil in dry or saturated condition upto any depth and lift upto any height including chiseling/wedging out rocks where blasting prohibited dewatering pumping or bailing out water where required and/ removal of slush seprately as directed which may arise during the execution including stacking the serviceable and unserviceable material and then returning stacked soil in any thickness of layers when required into plinth side of foundation etcetera consolidating each deposited layers by ramming and watering then disposing of all surplus unserviceable excavated earth as specified dumping place as per CPWD specifications 2019 complete and direction of Engineer-in- charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials.The rate includes octroi , royality , Malkhana , toll tax, goods service tax , labour cess or other taxes imposed by the Govt. | 173.03 | Per Cubic metre |
| 2 | Construction of granular sub-base by providing well graded material, mixing in a mechanical mix plant at OMC, carriage of mixed material to work site upto lead of 1000m spreading in uniform layers with motor grader on prepared surface and compacting with smooth wheel roller to achieve the desired density, complete for grading-1 material as as per CPWD specifications 2019 complete and direction of Engineer-in- charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials.The rate includes octroi , royality , Malkhana , toll tax, goods service tax , labour cess or other taxes imposed by the Govt. | 52.76 | Per Cubic metre |
| 3 | Proviidng and laying , spreading and compacting graded stone aggregate (size range 53 tem to 0.075 mm) to wet mix macadam (WMM)specification including premixing the material with water at OMC in for all leads and lifts, laying in uniform layers with mechanical paverfinisher in sub-base hase course on well prepared surface and compacting with vibratory roller of 8 (eight) to 10 (ten) tonne capacity to achievethe desired density, complete as per CPWD specifications 2019 complete and direction of Engineer-in- charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials The rate includes octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government | 48.04 | Per Cubic metre |
| 4 | Providing and applying tack coat with RS-I setting bitumen emulsion on WBM/WMM @ 0.40kg/sqm (at the rate of zero point four zero kilogram per square meter) using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface and cleaning with mechanical brooms per CPWD specifications 2019 complete and direction of Engineer-in-charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials. The rate includes octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government. | 320.25 | Per Square metre |
| 5 | Providing and applying tack coat with RS-I setting bitumen emulsion on bituminous surface @ 0.25kg/sqm (at the rate of zero point two five kilogram per square meter) using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface and cleaning with mechanical brooms as per CPWD specifications 2019 complete and direction of Engineer-in-charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials. The rate includes octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government. | 320.25 | Per Square metre |
1 Days Left