Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3754395 |
|---|---|
| Organisation Name | Building Construction Department |
| Tender Brief | Proposed Construction Of Integrated Public Health Laboratory (iphl) At Palamu (part-a). |
| Last Date For Submission | 24th Mar, 2026 |
| Opening Date | 27 Mar, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 175100.00 |
| Estimated Cost | 8751056.00 |
| City | Multi city |
|---|---|
| State | Jharkhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Supply, installation, testing and commissioning of modular OT Wall and corner panels with insulated prefabricated puff Panels. The OT wall shall be constructed using GI puff panels having 0.8 mm thick GI sheets on both sides. These panels should have been produced in a double band laminator, in which two continuously moving belts carrying 120 GSM galvanized steel sheets of | ||
| 2 | 80 mm thickness are firmly bonded together by sprayed -in insulating foam, which hardens during the process. The core consists of rigid polyurethane foam, which has been injected under high pressure, with a minimum density of 40kg/m3. The thickness of Puff shall be minimum 40 mm. The sheet panel shall be of indigenous reputed make and be provided with manufactures test certificate. The puff panel shall be fixed to the floor with bottom track of 1.5 mm thick steel U channel section having min size of 50mm X 50mm. The bottom shall be fixed in the floor of the OT with 10mm thicknessand min. 60 mmlong SS fasteners which shall be fully threaded and power drilled | ||
| 3 | The Panels of walls and ceilingshall be tied together by suitable SS coving. The individual wall panels of wall and ceiling shall be tied together by suitable SS coving. The individual wall panels shall be welded together bySS. All joints shall be filled with metal filler and shall be sand casted on site till smooth finish is obtained. Wall & panel joints shall not be visible after the final wall coating is applied. The gap between the masonry wall surfaces and the panel of the theatre shall be sufficient for the flush mounting of equipment s. This gap shall be provided to accommodate the equipment at a latter date and to enable services, pipes conduits etc, to be run within the gap | ||
| 4 | All wall-mounted equipment shall be flush mounted and sealed in operation theatre. All the sharp edges and corners shall be in radius to avoid bacterialcontamination. The wall panel design shall be such that it enables the installation and supports all equipment s. Provision of openings required for the installations shall not affect rigidity and strength of the panel. Access boxes shall be fitted to the rear of all wall-mounted equipment to enable maintenance to be carried out from outside the operation theatre. Product should have warranty of at least 10 years. Thework should be executed as per the directions of Engineer in-Charge. | 13.320 | Sqm |
| 5 | Supply, installation, testing and commissioning of modular OT Wall and corner panels with insulated prefabricated puff Panels. The OT wall shall be constructed using GI puff panels having 0.8 mm thick GI sheets on both sides. These panels should have been produced in a double band laminator, in which two continuously moving belts carrying 120 GSM galvanized steel sheets of |
6 Days Left