| Tender ID | 3814367 |
|---|---|
| Organisation Name | Water Resources Department |
| Tender Brief | Strengthening Of Embankment Of Grmc In Between 0.00 Km To 56.04 Km And Repairing Of Its Lining, Construction Of Dowel And Drain Of Grmc. |
| Last Date For Submission | 13th Apr, 2026 |
| Opening Date | 15 Apr, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 547191.00 |
| Estimated Cost | 54719006.00 |
| City | Multi city |
|---|---|
| State | Jharkhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation ,grass,bushes,shrubs,sapling and trees girth upto 300 mm ,removal of stumps of tree cut earlier and disposal of unservicable materials and stacking of materialsto be auctioned ,upto lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness. (Common SOR Part- A- 2.03 (i.A)) | 32.57 | per Ha |
| 2 | Earth work in bed clearance or desilting of canals caarrying F.S discharge of 28 cumecs or more in dead course of rivers etc in ordinary soil and removing the excavated earth in proper profile in spoils etc with initial lead of 30m and lift of 1.5m as per specification and direction of E/I. ( WRD Part B 7.1.18) | 1762.85 | per m3 |
| 3 | Dismantling of existing structures like culverts, bridge, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 meters. (Common SOR Part- A- 2.04 (i.B)) | 595.67 | per m3 |
| 4 | E/W in excavtion of foundation trenches in ordinary soil (vide classification of soil item -A) and disposal of excavated earth so obtained to a distance upto 50M and average lift of 1.5M including levelling ramming the foundation trenches removing the roots or shrubs etc all complete as per specification and direction of E/I. (WRD pt.-B 7.1.27) | 6862.28 | per m3 |
| 5 | Extra for earth work in hard soil (Vide classification of soil item-B) all complete as per specification and direction of E/I. (WRD Part B- 7.1.10) | 6862.28 | per m3 |