Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3682442 |
|---|---|
| Organisation Name | Local Self Government Department |
| Tender Brief | Corrigendum : Annual Plan-p.no.361/2025-2025 She Lodge-completion Works Of She Lodge In Ward-21 At Moovattupuzha Municipality |
| Last Date For Submission | 20th Mar, 2026 |
| Opening Date | 21 Mar, 2026 |
| Document Cost | 555.00 |
|---|---|
| EMD | 4236.00 |
| Estimated Cost | 169446.00 |
| City | Muvattupuzha |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | MAINTENANCE | ||
| 2 | 12.26.1:Providing and fixing plain multipurpose cement board(Hight pressure steam cured) with suitable screws for cement particle board in ceiling etc. complete (frame work to be paid seperatately).6 mm thick cement fiber board as per IS: 14862 | 29.925 | sqm |
| 3 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 114.000 | kg |
| 4 | 13.48.1:Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm | 29.925 | sqm |
| 5 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | 45.000 | sqm |
Ending Today