Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3682447 |
|---|---|
| Organisation Name | Local Self Government Department |
| Tender Brief | Corrigendum : Annual Plan-pro No.117/25-26 Painting And Related Maintenance Works In Govt. Sivankunnu School In Ward 22 Of Muvattupuzha Municipality |
| Last Date For Submission | 20th Mar, 2026 |
| Opening Date | 21 Mar, 2026 |
| Document Cost | 560.00 |
|---|---|
| EMD | 6351.00 |
| Estimated Cost | 254047.00 |
| City | Muvattupuzha |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Building Maintenance | ||
| 2 | 13.28.3:12 mm thick plain cement mortar bands in cement mortar 1:4 ( 1 cement : 4 fine sand) :Raised Band | 151.880 | per meter per cm |
| 3 | OD67972/2025-2026:Providing and laying in position ready mix shrinkage compensated, super flow micro-concrete for repairing existing cracked Slab by providing form work in suitable manner including cost of materials required for materials of micro- concrete, labour for placing and pouring concrete, curing etc complete excluding the cost of form work and reinforcement..(All work above plinth level upto floor V level) | 6.416 | cum |
| 4 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | 24.000 | sqm |
Ending Today