Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3778507 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Muzaffarnagar Jolly Rd Km 6 To Sardaro Ke Dera Road In Distt. Muzaffarnagar. |
| Last Date For Submission | 24th Mar, 2026 |
| Opening Date | 24 Mar, 2026 |
| Document Cost | 2714.00 |
|---|---|
| EMD | 408000.00 |
| Estimated Cost | 4150000.00 |
| City | Muzaffarnagar |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1 I/c all cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | 3630.00 | Cum |
| 2 | Construction of granular sub-base by providing Close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 | 232.00 | Cum |
| 3 | Providing, laying and spreading Material on a prepared sub grade, addingh cement (OPC) @ 2% by weight to the spread Material manually mixing in place with rotavator and compacting with road roller at OCM to achieve the desired unconfined compressive strength and to form a layer of sub-base. | 224.00 | Cum |
| 4 | Providing, laying and spreading Material on a prepared sub base, addingh cement (OPC) @ 4% by weight to the spread Material manually mixing in place with rotavator and compacting with road roller at OCM to achieve the desired unconfined compressive strength and to form a layer of base. | 345.00 | Cum |
| 5 | Brick lining on both side of the road of M-150 bricks 7 cm. wide. 11 cm. deep, laid with mud mortar including labour & supply of bricks finished to the required template and in proper alignment and also including dressing and ramming the excavated earth as directed by the Engineer-in-charge. As per New SOR Ch. 4 Item No. 4 | 1.30 | Km. |
4 Days Left