Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3779750 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Renewal Work With General Rapair On Nagina Bypass Road |
| Last Date For Submission | 24th Mar, 2026 |
| Opening Date | 24 Mar, 2026 |
| Document Cost | 2354.00 |
|---|---|
| EMD | 1130000.00 |
| Estimated Cost | 18600000.00 |
| City | Najibabad |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. as per MORTH Specification Clause 503 (i) for DBM. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST. | 58000.00 | Sqm |
| 2 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST. | 166.00 | Cum |
| 3 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST. | 1418.00 | Cum |
| 4 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST. | 3470.00 | Cum |
4 Days Left