Tendering Authority: PANCHKULA METROPOLITAN DEVELOPMENT AUTHORITY
Tender ID2229418
Organisation NamePANCHKULA METROPOLITAN DEVELOPMENT AUTHORITY
Tender BriefCorrigendum : Dpr For Design And Construction Of 20 Mld Into 2.5 Peak Factor 50 Mld Main Sewage Pumping Station, 20 Mld Sewage Treatment Plant Based On Sequential Batch Reactor (sbr) Technology, Tertiary Treatment Plant. Boundary Wall, Roads, Platforms, D.g. Set,
Last Date For Submission9th Mar, 2026
Opening Date09 Mar, 2026
Cost
Document Cost10000.00
EMD6262000.00
Estimated Cost313078906.00
Location
CityPanchkula
StateHaryana

Register to see full details

BOQ Items
#ItemQtyUnits
1Design & Construction including Supply, Installation, Testing and Commissioning of :- 50 MLD capacity MPS, Raw Pump House, Raw Stilling Chamber, Building work etc. Complete in all respect and any other work contingent thereto.20 MLD Sewage Treatment plant based on SBR technology, SBR Basin, Polyelectrolyte Solution Tanks, ,Building work other contingent works there to complete in all respect. Tertiary Treatment Comprising of Treated Effluent Collection Sump, Post Chlorination ,Receiving Chamber, Flash Mixer ,Ferric Chloride/Lime/Poly Solution Tanks, Clariflocculator, Rapid Sand Gravity Filter, Backwash/ Service Water, Backwash Tank complete. Administrative cum Chemical Building, Chlorination room, Tonner Shed, Raw Water pump panel room, Operating Gallery for Rapid Gravity filters, Centrifuge Building, Belt/Screw Press/Filter press building, Staff Quarters etc. complete in all respect. as per site requirement1.000Complete Job
2Design & Construction including Supply, Installation, Testing and Commissioning of :-50 MLD capacity MPS, Raw Sewage Lifting Pumps, Mechanical Coarse screens ,SCADA, PLC etc. inter connecting piping, valves, from MPS to STP. Complete in all respect and any other work contingent thereto.20 MLD Sewage Treatment plant based on SBR technology, SAS Sludge Lifting Pumps, RAS Sludge Lifting Pumps, Air Blowers, Sludge Lifting Pumps to dewatering system, Polyelectrolyte Metering Pumps, other contingent works there to complete in all respect. Tertiary Treatment Comprising of Treated Effluent Lifting Pump, ,Flash Mixer, Metering Pumps, Clariflocculator, Rapid Sand Gravity Filter, Backwash / Service Water, Backwash Tank Filling Pumps complete. Water pump, CCTV cameras, EX Terminal Lighting online analyzing metering system. complete in all respect. as per site requirement and satisfaction in the Engineering-in-charge.1.000Complete Job
3Boundary Wall - 900 mtr.1.000Complete Job
4Roads 3.75M Wide (M2)-1425 mtr1.000Complete Job
5Operation and Maintenance (for 5 years)1.000Complete Job
9th Mar, 2026

3 Days Left