Tendering Authority: Haryana Urban Development Authority
Tender ID3675124
Organisation NameHaryana Urban Development Authority
Tender BriefCorrigendum : Repair Of Road Infront Of House No.568 In Sector 21 Panchkula
Last Date For Submission24th Mar, 2026
Opening Date25 Mar, 2026
Cost
Document Cost250.00
EMD2160.00
Estimated Cost107864.00
Location
CityPanchkula
StateHaryana

Register to see full details

BOQ Items
#ItemQtyUnits
15.23.2:- Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate]$10.570P.Cum.
210.77:- Providing and laying 80mm thick factory made cement concrete interlocking paver block of M -35 grade made by block making machine with strong vibratory compaction, of approved size, design and shape, laid in required colour and pattern over (BIS 15658:2006) and including 60mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge. [Through Rate]$118.320P. Sqm.
317.70:- Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [Through Rate]$77.400P. Sqm.
430.9:- Regarding terracing of mud phaska covered with tiles or brick, in cement mortar by dismantling tiles or bricks, removing mud plaster, preparing the surface of mud phaska to proper slope, relaying mud plaster gobri leaping and tiles or bricks, grouted in cement mortar 1:3 (1 cement : 3 fine sand), including replacing unserviceable tiles or bricks with new ones and disposal of unserviceable material to the dumping ground (the cost of the new tiles or brick excluded), all complete as per direction of Engineer- in-Charge. [Through Rate]$29.580P. Sqm.
56.3.1:- Providing and laying cement concrete in kerbs, steps and the like at or near ground level excluding the cost of centering, shuttering and finishing. 1. 1:11 2:3 (1 Cement: 11 2 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate]$1.350P. Cum.