Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3504111 |
|---|---|
| Organisation Name | Public Health Engineering Department |
| Tender Brief | Corrigendum : Operation And Maintenance Of Distribution System Including Rising Main And Fhtc For Chemaguri Piped Water Supply Scheme Of Sagar Block Under Kakdwip Sub-division Of Alipore Division, Phe Dte. (from 01.09.2025 To 31.08.2026) |
| Last Date For Submission | 27th Mar, 2026 |
| Opening Date | 30 Mar, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 8795.00 |
| Estimated Cost | 439774.00 |
| City | Parganas |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Operation and Maintenance of distribution system and Rising main pipe line (CI / DI / AC / UPVC / HDPE / GI) and FHTC (for 366 days) including Opening & closing of all the different dia Sluice Valves (80 mm dia to 350 mm dia) on different places along the alignment of the rising main and distribution main at different places over the command area daily as and when required for regulating the supply of water and distributing' water all over the command area smoothly including changing and restoration of gland packing of sluice valve, air valve if required including opening the cap / plug of wash out point or opening the sluice valves including de-jointing flange joints (80 mm to 350 mm dia) including repairing works and cleaning the pipeline or changing of gate, spindle or liner etc. of sluice valves all complete, restoration works to be done including earth work in the excavation bailing out of water, re-filling the excavated earth, taking out of RCC slab or slab cover and refixing true to position etc. all complete as per the specification and direction of EIC. [Labour charges for operation and guarding of pump / valve / disinfection arrangement with all accessories @ Rs. 487.00 / day / person + add bonus @ 8.33% i.e. Rs. 40.57 / day / person = Total Ra. 527.57 + overhead Expenses @ 5% i.e. Rs. 24.35 + Contractor's profit @ 10% i.e. Rs. 52.76 = Rs. 604.57 + ESIC contribution of employers @ 3.25% on labour charges i.e. Rs. 15.83 + EPF contribution of employers @13% on labour charges i.e. Rs. 63.31 = Total 683.81 say, Rs. 684.00] [N.B. :- i) Details scope of work and rates and measurement will be made as per Annexure - I ii) Any maintenance work carried out which is not included in the scope of work in Annexure - I (enclosed) may be done considering rates as per current PHE / PWD SOR. / SE / SWC] iii) The total amount inclusive of all duties, 18% GST, 1 % Cess and other relavant taxes & charges. | 1 | Item |
10 Days Left