Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3693143 |
|---|---|
| Organisation Name | Kerala Water Authority |
| Tender Brief | Corrigendum : Jjm-5th Swsm Wss To Mylapra, Malayalappuzha And Vadasserikkara Panchayaths - Construction Of 6ll Ohsr,7ll Glsr, Pump House At Pezhumpara, Supply And Laying Of Pumping Mains, Supply And Erection Of Pumpsets, Etc At Vadasserikara Panchayath |
| Last Date For Submission | 30th Mar, 2026 |
| Opening Date | 31 Mar, 2026 |
| Document Cost | 19518.00 |
|---|---|
| EMD | 500000.00 |
| Estimated Cost | 112369013.00 |
| City | Pathanamthitta |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Construction of 6 LL OHSR, 7 LL GLSR & Pumphouse at Pezhumpara | ||
| 2 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 625.000 | sqm |
| 3 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 937.500 | cum |
| 4 | 2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock | 187.500 | cum |
| 5 | 2.9.3:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Hard rock (blasting prohibited) | 93.750 | cum |
6 Days Left