Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3755570 |
|---|---|
| Organisation Name | Border Roads Organisation |
| Tender Brief | Ssi, Dgn And Constr Of Two Nos Maj Pmt Bdg Of Span 50m Over Hmaranglui River At Km 98.100 And 45 M Over Chotta Golsuri River At Km 140.875 On Rd L-d-p Incl Both Side Approach Road For All Two Brs Under 71 Rcc/24 Tf Under Pro Psk In Mizoram |
| Last Date For Submission | 28th Apr, 2026 |
| Opening Date | 29 Apr, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 850565.00 |
| Estimated Cost | 105113000.00 |
| City | Pushpak |
|---|---|
| State | Mizoram |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | PART-I (BRIDGE PROPER HMARANGLUI NALLAH AT KM 98.100) | ||
| 2 | Sub Soil Investigation, Design including proof checking and construction of 50.00 m Single span Major Pmt bridge with PSC box girder Superstructure on open foundation over Hmaranglui Nallah at Km 98.100 on Lawngtlai-Diltlang-Parva Road under 71 RCC / 24 BRTF Project Pushpak in Mizoram State with span arrangement as per NIT Drg and based on hydraulic data, ground data, sub soil data, Special conditions, Particular specifications of the tender document. Construction works includes all preparatory work, Erection of staging/shuttering, abutments, wing walls, return wall, placing of POT cum PTFE bearings, casting of PSC box girder superstructure, wearing coat having nonskid surface in uniform thickness, strip seal expansion joints, foot paths, kerbs, RCC hand rails, Crash barrier, drainage spout, back filling behind abutments , wing walls, return wall , approach slab, temporary river training works and diversion, Painting and all other items of works required for the completion of the bridge including curing and load testing Drg No B-2142/B&T Dte/Psk/2020 dt 28 Oct 2020 | 1 | Nos |
| 3 | PART-II (BRIDGE PROPER CHOTTA GOLSURI RIVER AT KM 140.875) | ||
| 4 | Sub Soil Investigation, Design including proof checking and construction of 45.00 m Single span Major Pmt bridge with PSC box girder Superstructure on open foundation over Chotta Golsuri River at Km 140.875 on Lawngtlai-Diltlang-Parva Road under 71RCC / 24BRTF Project Pushpak in Mizoram State with span arrangement as per NIT Drg and based on hydraulic data, ground data, sub soil data, Special conditions, Particular specifications of the tender document. Construction works includes all preparatory work, Erection of staging/shuttering, abutments, wing walls, return wall, placing of POT cum PTFE bearings, casting of PSC box girder superstructure, wearing coat having nonskid surface in uniform thickness, strip seal expansion joints, foot paths, kerbs, RCC hand rails, Crash barrier, drainage spout, back filling behind abutments , wing walls, return wall ,approach slab, temporary river training works and diversion, Painting and all other items of works required for the completion of the bridge including curing and load testing Drg No B-2129/B&T Dte/Psk/2020 dt 28 Oct 2020. | 1 | Nos |
| 5 | PART-III (APPROACHES TO HMARANGLUI NALLAH AT KM 98.100) |
41 Days Left