Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3752850 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | New Construction Of Missing Link In Village Kesauli From Near Salikram House Via Primary School Sheetla Mata Temple To Kanpur Highway |
| Last Date For Submission | 23rd Mar, 2026 |
| Opening Date | 23 Mar, 2026 |
| Document Cost | 2714.00 |
|---|---|
| EMD | 430000.00 |
| Estimated Cost | 4600000.00 |
| City | RaeBareli |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pits with all lifts upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1 and 300.2 with lead up to 1000m as per technical specification clause 301.5 | 3100.00 | Cum. |
| 2 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | 51.00 | Cum. |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density as per MORD specification 401 | 180.00 | Cum. |
| 4 | Providing, Laying and spreading Material on a prepared sub grade, adding cement @ 2% by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a leyer of sub-base. | 300.00 | Cum. |
| 5 | Providing ,Laying and spreading material on a prepared sub-base, cement @ 4% by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base. | 350.00 | Cum. |
5 Days Left