Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3752989 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | New Construction Work At Haathee Karauda Maarg Km. 11 Se Roneehaajipur Maarg In Distt. Shamli In. F.y. 2025-26 |
| Last Date For Submission | 23rd Mar, 2026 |
| Opening Date | 23 Mar, 2026 |
| Document Cost | 2714.00 |
|---|---|
| EMD | 728000.00 |
| Estimated Cost | 10559000.00 |
| City | Saharanpur |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | 184.00 | cum |
| 2 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | 793.00 | cum |
| 3 | Providing, laying and spreading Material on a prepared sub base, addingh cement (OPC) @ 4% by weight to the spread Material manually mixing in place with rotavator and compacting with road roller at OCM to achieve the desired unconfined compressive strength and to form a layer of base. I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | 540.00 | cum |
| 4 | Providing, laying, spreading and compacting stone aggregates of specific sizes 53 mm to 22.4 mm to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | 112.00 | cum |
| 5 | Brick lining on both side of the road of M-150 bricks 7 cm. wide. 11 cm. deep, laid with mud mortar including labour & supply of bricks finished to the required template and in proper alignment and also including dressing and ramming the excavated earth as directed by the Engineer-in-charge.SI No. 4 Ch. 4 I/c all taxes, Labour cess, levy, toll fee, royalty, cost of bitumen, Contractor Profit but excluding GST. | 1.20 | Km. |
5 Days Left