Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Northern Coalfields Limited
Tender ID3674700
Organisation NameNorthern Coalfields Limited
Tender BriefCorrigendum : Transportation, Laying And Dismantling Of Pipeline For Dewatering In Mines During Monsoon And Non Monsoon Period 2026-27 At Khadia Project
Last Date For Submission27th Mar, 2026
Opening Date28 Mar, 2026
Cost
Document Cost0.00
EMD16400.00
Estimated Cost1307456.00
Location
CityShaktinagar
StateKarnataka

Register to see full details

BOQ Items
#ItemQtyUnits
1Laying 10"/12" MS pipeline including transporting, stacking ,laying, welding and jointing works along with fabrication of bend and flange(Monsoon Period)
2Transportation of MS pipe 10"/12" from designated location i.e New workshop, OB time office, Barrier No 04 or any other places in mines to Sump1, Sump2, Sump3 water discharge route etc by providing suitable truck, Truck mounted crane or any other mechanical means and suitable slings, clamps etc as required along with laying /relaying along the mine terrain as per requirement to maintain continuity of water delivery from various sumps to designated discharge points in the mines.5000.000Mtrs
3Cutting,shaping ,aligning,fitting of MS pipeline (of 06 mtr or 12 mtr or as per availability),welding of MS pipeline (of 06 mtr or 12 mtr or as per availability) and checking of joints after welding. welding of MS pipe shall be done by DG set provided by the contractor and diesel also to be provided by the contractor (no electricity shall be provided)417.000Joint
4Fabrication and erection of different size of bend of MS pipe ( 300 mm - 10 no , 250 mm -15 no. ,200 mm -5 no. ) & Flange 12 mm MS Plate -300 mm dia - 30 no. ( Welding rod ,Welding machine and other welding accessories & cutting set provided by contractor throughout the contract period)2.750MT
5Deploying of 01 No. 3Phase , 7.5KVA, DG welding Set on 12 hr per day basis including shifting, mobile and operation charges for the purpose of welding works related to pipeline welding and bend fabrication work as & when required, diesel shall be provided by the contractor ( Rate is inclusive of Labour Charges,Hiring charges & contractors Profit etc ). Considering 12 joint made per day and one MS pipe bend is made per day.65.000Days
27th Mar, 2026

3 Days Left