Tendering Authority: Ropeway And Rapid Transport System Development Corporation HP Limited
Tender ID2832775
Organisation NameRopeway And Rapid Transport System Development Corporation HP Limited
Tender BriefCorrigendum : Construction Of Balance Work Of Lifts From Auckland Area To Police Chowki Lakkar Bazar In Smart City Area Based Development.
Last Date For Submission9th Mar, 2026
Opening Date09 Mar, 2026
Cost
Document Cost8260.00
EMD407000.00
Estimated Cost20351783.00
Location
CityShimla
StateHimachal Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in surface excavation not exceeding 30 cm in (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.15.625Cum
2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size)0.400Cum
3Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.370.080Kg
4Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns.9.360Sqm
5Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement,including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately). All works upto plinth level Extra for providing richer mixes at all floor levels. Providing M-30 grade concrete instead of M- 25 grade BMC/ RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum)3.084Cum