| Tender ID | 2832775 |
|---|---|
| Organisation Name | Ropeway And Rapid Transport System Development Corporation HP Limited |
| Tender Brief | Corrigendum : Construction Of Balance Work Of Lifts From Auckland Area To Police Chowki Lakkar Bazar In Smart City Area Based Development. |
| Last Date For Submission | 9th Mar, 2026 |
| Opening Date | 09 Mar, 2026 |
| Document Cost | 8260.00 |
|---|---|
| EMD | 407000.00 |
| Estimated Cost | 20351783.00 |
| City | Shimla |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. | 15.625 | Cum |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) | 0.400 | Cum |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 370.080 | Kg |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns. | 9.360 | Sqm |
| 5 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement,including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately). All works upto plinth level Extra for providing richer mixes at all floor levels. Providing M-30 grade concrete instead of M- 25 grade BMC/ RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum) | 3.084 | Cum |