Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3779793 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Construction Of 05 Year Maintenace Of Dabkaha To Ajjepur Link Road |
| Last Date For Submission | 25th Mar, 2026 |
| Opening Date | 25 Mar, 2026 |
| Document Cost | 2715.00 |
|---|---|
| EMD | 1360000.00 |
| Estimated Cost | 0.00 |
| City | Sitapur |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5 | 17591.50 | Cum |
| 2 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m to as per Technical Clause 301 (S.No. 3.6) of MORTH Specification. | 59.40 | Cum |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. GSB | 306.90 | Cum |
| 4 | Providing, Laying and spreading Material on a prepared sub grade, adding cement (OPC)@2% by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired uncofined compressiv strength and to form a layer of sub base, | 937.50 | Cum |
| 5 | Providing, Laying and spreading Material on a prepared sub base(WMM), cement (OPC) @ 4% by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired uncofined compressive strength and to form a layer of base. | 1106.25 | Cum |
5 Days Left