Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Ministry Of Road Transport And Highways
Tender ID2828291
Organisation NameMinistry Of Road Transport And Highways
Tender BriefCorrigendum : Fdr Mohol Kural Kamati Nh 465 Km 55.840 To 56.040
Last Date For Submission12th Mar, 2026
Opening Date17 Mar, 2026
Cost
Document Cost5000.00
EMD23400.00
Estimated Cost2340026.00
Location
CitySolapur
StateMaharashtra

Register to see full details

BOQ Items
#ItemQtyUnits
1Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader/ Paver on prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 401 -- Plant Mix Method and Grading - I Material110Per One Cubic Meter
2Wet Mix Macadam -- Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.Laying By Grader/Paver82.5Per One Cubic Meter
3Prime coat - Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including cleaning of road surface and spraying, primer at the rate of 0.60 kg/sqm using mechanical means550Per One Square meter
4DENSE BITUMINOUS MACADAM: Proving and laying dense bituminous macadam using crushed aggregates of Grading 1, premixed with bituminous binder of specified grade of Bitumen @ 4.50 per cent by weight of total mix and filler, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired density for 76-100 mm compacted thickness .USING Batch mix type hot mix plant with SCADA, Sensor Paver, Vibratory roller with Stone Dust filler.(VG-40 bulk bitumen rates are considered to arrive at rates)65Per One Cubic Meter
5Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen with sprayer on Dry / Hungry B.T. surface 3 kg/10 sqm. (VG-30 bulk bitumen rates are considered to arrive at rates)1300Per One Square meter
12th Mar, 2026

6 Days Left