Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3747195 |
|---|---|
| Organisation Name | Shri Amarnathji Shrine Board |
| Tender Brief | Augmentation Of The Cloak Room No 1 And Construction Of Additional 02 No. Cloak Rooms And Upgradation Of Area Outside Shoe Rack By Way Of Supply Of Additional Racks, Construction Of Sitting Benches And Pucca Platform At Holy Cave And Lower Holy Cave. |
| Last Date For Submission | 24th Mar, 2026 |
| Opening Date | 25 Mar, 2026 |
| Document Cost | 944.00 |
|---|---|
| EMD | 16000.00 |
| Estimated Cost | 800000.00 |
| City | Srinagar |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth All kinds of soil | 52.90 | cum |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 24.71 | cum |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 30% plumb | 19.62 | cum |
| 4 | Dumping of stones including cost of stones on horizontal layers | 16.50 | cum |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases etc | 30.00 | sqm |
6 Days Left