Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3807877 |
|---|---|
| Organisation Name | Integral Coach Factory |
| Tender Brief | Supply Of Pu Bush (yellow Colour) Od 65mm,id 17.5mm, Length 100mm. Note: 1. Visual Inspection . Surface Finish: Inspect For Cracks, Pits, Or Air Bubbles (voids) Which Can Lead To Premature Failure Undercompression. . Edges: Ensure Clean-cut Edges Without Fraying Or Burrs That Could Interfere With The Punch Movement. 2. Dimensional Verification Use Calibrated Digital Vernier Calipers Or Micrometers To Check Againstthe Design Specifications: . Inner Diameter (id): Must Allow A Snug Fit Over The Punch Without Binding. . Outer Diameter (od): Should Fit The Housing/pocket Correctly To Allow For Natural Bulging During Compression. . Length/height: Consistency Across A Batch Is Critical For Uniform Stripping Force. 3. Mechanical & Material Testing . Hardness Test: Use A Shore A Durometer. Acceptance Typically Requires A Reading Of 90 Shore A (+/_5) For Standard Industrial Punch Strippers. . Compression/permanent Set: . Compress The Bush To Its Maximum Recommended Stroke (typically 25%-30%) For A Set Duration. . Acceptance Criteria: After Releasing The Load, The Bush Should Return To Its Original Height. A Permanent Set (creep) Of More Than 5%-8% After Initial Cycles May Be Cause For Rejection. . Stiffness Variation: The Percentage Variation In Stiffness Before And Aftertest Cycles Should Generally Remain Within 20% Of The Original Value. 4. Advanced Verification (batch Acceptance) . Oil & Chemical Resistance: For High-volume Production, Submerge A Sample In The Lubricant Used In The Press For 24 Hours. The Material Should Not Swell Or Become Brittle. [ Warranty Period: 30 Months After The Date Of Delivery ] |
| Last Date For Submission | 30th Mar, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 0.00 |
|---|---|
| EMD | 0.00 |
| Estimated Cost | 0.00 |
| City | Refer Documents |
|---|---|
| State | Tamil Nadu |
6 Days Left