Tendering Authority: Public Works Department
Tender ID3799834
Organisation NamePublic Works Department
Tender BriefConstruction Of Girls And Boys Toilet At 1. Primary School Moh. Audhrian 2. Middle School Jabran. (under Samagra Shikha Pab 2025-26). 2nd Call.
Last Date For Submission28th Mar, 2026
Opening Date30 Mar, 2026
Cost
Document Cost600.00
EMD16480.00
Estimated Cost824000.00
Location
CitySurankote
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed in all kinds of Soil.37.72Cum
2Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).3.78Cum
3Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size).18.44Cum
4Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) & Extra for brick work with common burnt clay bricks /cement concrete bricks in superstructure above plinth level upto floor five level.10.56Cum
5Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 , landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1 :3 (1 cement : 1 coarse sand : 3 graded stone aggregate 20 mm nominal size).4.44Cum