Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3799835 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Construction Of Girls And Boys Toilet At 1. Girls Middle School Galyote 2. Primary School Bari Barian. (under Samagra Shikha Pab 2025-26). 2nd Call. |
| Last Date For Submission | 28th Mar, 2026 |
| Opening Date | 30 Mar, 2026 |
| Document Cost | 600.00 |
|---|---|
| EMD | 16480.00 |
| Estimated Cost | 824000.00 |
| City | Surankote |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed in all kinds of Soil. | 37.72 | Cum |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 3.78 | Cum |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | 18.44 | Cum |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) & Extra for brick work with common burnt clay bricks /cement concrete bricks in superstructure above plinth level upto floor five level. | 10.56 | Cum |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 , landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1 :3 (1 cement : 1 coarse sand : 3 graded stone aggregate 20 mm nominal size). | 4.44 | Cum |
4 Days Left