Tendering Authority: Uttar Pradesh Power Transmission Corporation Limited
Tender ID2967102
Organisation NameUttar Pradesh Power Transmission Corporation Limited
Tender BriefCorrigendum : Work For Loading, Carriage And Unloading Of 40 Mva Transformer From 220 Kv S/s Bharthna (etawah) To 132 Kv S/s Kabrai Under Etd Hamirpur.
Last Date For Submission16th Mar, 2026
Opening Date17 Mar, 2026
Cost
Document Cost590.00
EMD5000.00
Estimated Cost440730.00
Location
CityTindwari
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Details of Work/Supply.
2Shifting of oil filled 40 MVA 132/33 KV Transformer with accessorles hom existing place at 220kV S/s Bharthana to near loading place,trailer with the help of rail pulling divice sleepers etc. upto distance of 20 Mtr. inculding turnings if requlred,.The approximate distance of shifting the T/F tank at 220kV substation Bharthana.1Job
3Additional Shiting of transformer tank for each 5 meter16Job
4Loading 40 MVA Transformer and with accessories on trailor, truck, Jacking the Transformer tank for placing the wooden sleepers under transformer tank and similarly lifting the T/F tank by the jack and placing the sleopors continuously till the wooden platform cornes to the height of trailor bed and then shifting the T/F tank from wooden platforms to the trailer, propor tightening of T/F mounted on the trailer with the help of wire rope and heavy turn buckle for safe transportation from 220 KV S/S Bharthana. This work will be carried out at 220 KV S/S Bharthana.1Job
5Safe Carringe as per rules of road transport of 40 MVA & accessories on private truck/trailer to be provided by contractor from 220 KV S/S Bharthana to 132 KV S/S Kabrai (approx distance 275 Km.). The Insurance has to be arranged by Contractor and the insurance will be paid as per actual on producing the receipt as desired by supervising engineer. The trailer is to be arranged from Bharthana depends on extra avalbility of the movable axis trailer.The route shall be decided after transporter conducting all the necceassary survey and subsequent route approval with field officer of upptcl and odometere reading shall be noted by JE at 220 kV S/s Bharthana and end point 132kV S/s Kabrai.All Labour, T&P, trailer etc, will be arranged by contractor at his own cost. Including Toll-Tax-etc.275Km.
16th Mar, 2026