Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3751937 |
|---|---|
| Organisation Name | Pey Jal Nigam Uttarakhand |
| Tender Brief | Construction Of Proposed Balance Work Of Block-3 Building At Institure Of Technology, Baun, Uttarkashi |
| Last Date For Submission | 7th Apr, 2026 |
| Opening Date | 08 Apr, 2026 |
| Document Cost | 5900.00 |
|---|---|
| EMD | 721000.00 |
| Estimated Cost | 36070000.00 |
| City | Uttarkashi |
|---|---|
| State | Uttarakhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. :All kinds of soil. | 88.10 | Cum |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 23.15 | Cum |
| 3 | P/L C.C. of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 cement : 4coarse sand : 8 graded stone aggregate 40 mm nominal size) | 7.82 | Cum |
| 4 | Diluting and injecting chemical emulsion (Chlorpyriphos/Lindane E.C. 20% with 1% concentration), at the rate of one litre per hole at 300 mm c/c to all the horizontal and vertical surfaces of the excavations made for the foundation of the building, soil under floors, apron, back fill material and along all the faces of the walls for PRE-CONSTRUCTIONAL anti-termite treatment (including the cost of chemical emulsion) as per IS:6313 Part-II. (Plinth area of Building shall be measured for Payment) | 950.52 | Sqm |
| 5 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. All works above plinth level upto floor V level. | 78.26 | Cum |
20 Days Left