Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Industries And Mines Department
Tender ID3468288
Organisation NameIndustries And Mines Department
Tender BriefCorrigendum : Widening & Strengthening Of Approach Road, Swd, Revamping And Shifting Of Water Supply Line At Intake Well At Vapi Notified Area Under Aii Scheme
Last Date For Submission18th Mar, 2026
Opening DateRefer to Documents
Cost
Document Cost21240.00
EMD2323125.00
Estimated Cost232312120.00
Location
CityValsad
StateGujarat

Register to see full details

BOQ Items
#ItemQtyUnits
1Part- A ( Road Work ) Clearing and grubbing road land including uprooting rank vegetation grass bushes, shrubs, sapling and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials (C) By mechanical means in area of light jungle1.320Ha
2Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff with all lead and lift as instructed by EIC.- B Dense or Hard soil2611.430Cum
3Earthwork for embankment including breaking clods, dressing with all lead and lift and including watering rolling and consolidation of subgrade in layers at O.M.C. to required dry density including filling the depression which occur during the process using power roller 8T to 10T. - C From Borrow area within with all lead and lift as instructed by EIC34558.390Cum
4Supply and installation of polyester needle punched non woven geotextile as filter media below Subgrade, as per MoRTH 700 Type-II geotextile. The width of geotextile roll shall not be less than 4.5 m, at easily accessible location including top and bottom, with all leads and lifts, manpower and machinery, materials, labour etc. complete and as directed by Engineer - In - Charge. - 200 GSM13650.900Sq mt
5Earthwork for embankment Subgrade , including breaking clods, dressing with all lead and lift and including watering rolling and consolidation of subgrade in layers at O.M.C. to required dry density including filling the depression which occur during the process using power roller 8T to 10T. - B From Borrow area.5753.150Cum
18th Mar, 2026

4 Days Left